Remember finished floor means finished floor.
Difference between finished floor and pad elevation.
I create pads as 1 4 thick elements and call it vapor barrier with it running to the outside face of finish on the exterior walls.
Finished floor level ffl refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied.
And the garage has proper openings flood vents.
Its elevation equals the bottom of the granular layer below the ground floor slab typically 8 for 4 slab and 4 fill.
Finished floor f f elevation is a reference plane used as a zero point for vertical dimensions.
Once the finish floor elevation is established the other project elevations are based off the finish floor.
The impact of the finished floor level is that the difference between the structural floor level and the finished floor level may require the removal of a portion of the bottom of doors.
To set a building at a predetermined ffe set the minimum and maximum z to the same elevation.
If you know how to calculate the finished floor level you may find problems with the quote for flooring your home or office.
Typical usage is no component of a hanging li.
This means whatever the final floor product is such as ceramic tile wood the thickness of that material is included in the finished floor height.
Then i just turn off pads in my section views.
A finished floor level can be for any floor.
If a building not described and rated as a single family dwelling located in an a zone has an attached garage and the floor level of the garage is below the level of.
So in concrete construction it may be the uppermost surface of a screeded finish or in timber construction ffl will denote the top level of.
If user only set one and not the other z then that leave the optimizer to either grade.
The garage floor elevation is below the elevation of the top of the bottom floor.
Reference plane as it s name implies is the top surface of the finished flooring material.
The finish floor is then considered ff 0 0.
Good drawings always have a page s that show the elevations for critical segments of any building.
In the properties i set my building pad elevation at 1060 00 and the finished floor elevation is displaying at 1051 876 which is lower than the building pad elevation.
When designing our sewer we usually aim to be 3 lower than the contour passing through the middle of the building pad.
Finished floor level designing buildings wiki share your construction industry knowledge.
That wall would be 16 feet 6 inches above the finish floor.
For example you may have masonry walls on the sides of the building showing top of wall at 16 feet 6 inches on the drawings.
The grading optimizer then knows to only grade at that elevation.
I need to gain a better understanding of to establish the finished floor elevation or adjust the building pad elevation.