If you place laminate flooring on a weak or uneven sub floor the new floor will be compromised and eventually buckle damage the laminate locking system creak or create micro gaps in the new floor.
Different techniques for laying laminant flooring.
Open several boxes and stack like patterns together.
Next cut strips of underlayment to size and lay the strips down across the exposed floor.
Most dips can be taken care of with a trowel and vinyl floor patch.
A dip in the floor will cause a soft spongy section in the laminate floor.
Lay out the unopened boxes of laminate planks in the room.
It typically takes about 4 hours to install laminate flooring in a 10 x 12 foot room.
You ll also want to tear up any carpet in the room and remove the leftover tack strips.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Be sure to mix and match from more boxes than 1 or 2 to accommodate color variations between boxes we counted 11 different designs which was great.
We laid ours long ways to create depth and make the rooms feel larger.
Sub floors are typically concrete or cement and develop weaknesses over time.
But before i share my most valuable tips on installing laminate flooring i want to show you the filthy carpet and the sub floor underneath.
Once you are ready to lay the flooring decide which way you will lay it.
There needs to be a gap of 1 1 8 inches between the two halves of the transition to.
I was truly shocked by what we saw when we ripped out the carpet.
To lay laminate flooring first clear out any furniture in the room you ll be laying the floor in.
Making a transition to a different style of laminate flooring isn t much different than running one type of flooring through it provided the floors in both rooms have the same thickness and.
They should acclimate for at least 48 hours.
This will allow them to acclimate to the room s temperature and humidity.
Buy a fast drying variety if you want to start laying the floor the same day.